Centro Industrial PEB · Las Mañanitas

CNC manufacturing plant in Panama City

NewCon Steel® manufactures its profiles at the group's CNC plant, which has been in operation since 2018 at Centro Industrial PEB, Las Mañanitas, Panama City. Its CNC cold-forming lines cut, punch, mark, and label every profile to a ±0.5 mm (±0.02 in) tolerance, and every piece can be traced back to the originating steel lot.

Coated coil goes in at one end, and a finished structural member comes out at the other. This page walks the line step by step, so you can see how your steel is made before you issue a purchase order.

±0.5mmManufacturing dimensional tolerance
0.85–2.5mmSheet thickness range (0.033–0.098 in)
275g/m²Zn-Al-Mg coating, total across both faces (0.90 oz/ft²)
20,000m²/monthProduction capacity, CFS structure (about 215,000 sq ft/month); not a lead time
The process

Coil to finished member, on a single line

Coated coil enters the mill and leaves as a finished structural member, marked, labeled, and ready to assemble, with no manual cutting in between.

The coil is loaded onto the decoiler and fed into the roll-forming line, where the steel is cold-formed at ambient temperature into the structural section. On the same line, CNC control cuts each piece to length, punches the service and pass-through holes, and marks and labels it.

As a result, each member reaches your site with its mark, its position in the model, and its holes. No measuring, cutting, or drilling is needed in the field. Cutting scrap stays at our plant instead of landing on your job budget.

CNC plant at Centro Industrial PEB, Las Mañanitas, Panama City, operated under Panama's EMMA regime (Law 159 of 2020), which allows duty-free import of machinery, raw material and inputs.

Cold forming is also the transformation that supports the Panamanian origin of the goods: it changes the tariff heading of the product, from flat-rolled product to structural section. The coating confers no origin; the forming does.

  • Cold roll-formed from coil, with no fabrication welding in the section
  • Cut-to-length, punching, marking, and labeling, all in-line
  • Every piece identified against the structural model and its cut list
  • Manufacturing dimensional tolerance of ±0.5 mm
Cold formingCNC cuttingPunchingMarking and labeling
Cold roll-forming line and coil decoiler on the NewCon Steel production floor, with operators assembling structural frames
Cold roll-forming line and coil decoiler on the plant floor.
Manufacturing parameters

What you can check line by line against your spec

Every one of these values appears on the mill certificate and on the data sheet we issue with the order. If a figure is not on this page, it is not yet confirmed for your project, and we confirm it in writing in the quote.

Feedstock

Base steel
Steel sheet for cold-formed framing members, ASTM A1003/A1003M (Type H structural grades)
Coating
Zinc-aluminum-magnesium (Zn-Al-Mg) coated steel: ZM275 (EN 10346) / ZMM275 (ASTM A1046/A1046M Type 1)
Coating mass
275 g/m² total across both faces (≈137.5 g/m² per face)
Sheet thickness
0.85 mm to 2.5 mm

Forming and machining

Process
Cold roll-forming from coil
In-line operations
CNC cut-to-length, punching, marking, and labeling
Dimensional tolerance
±0.5 mm
Connections
Screwed / bolted. No field welding and no site galvanizing

Identification, assembly and dispatch

Piece marking
Every member marked and labeled to its position in the structural model
Pre-assembly
Walls, floor cassettes, and trusses assembled in the plant and checked against the shop drawings
Bundling
Profiles and panels bundled, strapped, and identified by lot
Documentation
Mill certificate for the steel, take-off and cut list, and, when the scope includes engineering, sealed structural calculations

Production capacity of 20,000 m² per month (cold-formed steel structure, Las Mañanitas plant); the lead time of each order is confirmed against the order. Fabrication and dispatch lead times depend on the production schedule and are confirmed in writing in the quote for your project.

From purchase order to truck

How an order gets produced

01

Scope and take-off

We receive the structural model, the drawings, or, if you do not have them yet, the area and the building type. From that we prepare the take-off: how many pieces you need, in which section and thickness, and in what sequence they are needed on site.

24 business hours
02

Formal quote

We issue the quote with the scope of supply, the documentation included, and the dispatch terms. Prices are always given in writing, not as a phone estimate.

48 h
03

Scheduling and forming

The cut list is loaded to the line. The steel is formed, cut, punched and labeled piece by piece against the model.

04

Assembly and check

If the scope includes panels, they are assembled and dimensionally checked against the shop drawings before bundling. Correcting a squareness error in the plant costs less than correcting it on site.

05

Bundling, documentation, and dispatch

Material is bundled by lot and ships with the mill certificate and, for export orders, the Panamanian certificate of origin.

Dimensional control

Squareness is checked in the plant, not on site

In the plant, a panel that is out of square takes one adjustment to fix. On an island job site, with the crane on a day rate, the same error can set back the schedule.

Every frame and every panel is checked against the shop drawings before it moves to bundling. NewCon Steel's manufacturing dimensional tolerance is ±0.5 mm, and that is the figure controlled piece by piece.

Traceability follows the same logic: every piece can be tracked back to the steel lot it came from. When a reviewer asks for the mill certificate, nobody has to reconstruct it, because it is already tied to the lot.

  • Dimensional check of the frame against the shop drawings
  • Traceability from the piece back to the originating steel lot
  • Mill certificate for the steel available with the order
Operator checking the assembly and squareness of a light-gauge steel structural frame against the shop drawing at the NewCon Steel plant
Dimensional check of the frame against the shop drawing.
Product

What comes off these lines

Pre-assembled

Structural panels

Wall panels, floor cassettes, and trusses assembled in the plant, numbered and sequenced against the structural model.

AISI S240-20
Pre-assembled structural panels →
One purchase order

Structural kits

The building's entire structure (profiles, panels, connections, and accessories) on a single purchase order.

Sealed calculations
Complete structural kits →
No field welding

Bolted structural steel

Zn-Al-Mg–coated frames and structure, with holes and connections made in the plant, so erection is done with bolts.

Bolted erection
Bolted structural steel →
The plant

Centro Industrial PEB, Las Mañanitas, Panama City

Production hall, roll-forming line, profile staging, frame assembly, overhead crane, and dispatch yard.

The ISO certifications belong to the PEB Corp Group

ISO 9001, ISO 14001, ISO 45001, and ISO 37001 are PEB Corp Group certifications. They are not certifications of NewCon Steel as an independent entity, and we are not going to present them as such. The plant operates inside Centro Industrial PEB, under the group's management systems. We spell this out because an auditor will check it.

Send your take-off, and we will confirm scope and lead time

Reply within 24 business hours · technical proposal / quote in 48 h. Send quantities in linear meters, m², or metric tons (1,000 kg), plus profile thickness and destination country.