Skip to content

PEB Corp Group · NewCon Steel® · LGS/CFS manufacturing

A structural module being lifted on site
PEB Corp Group

Projects with a cold-formed steel structure

The PEB Corp Group has been delivering projects since 2009. On some of our projects, the cold-formed steel structure was fabricated at the group plant, in operation since 2018; on others, the group carried out the installation. Two references: the Ministry of Defense, 39,000 m² (about 420,000 sq ft) in 8 months, and Universidad del Rosario, 11,500 m² (about 123,800 sq ft) in 100 days.

The projects on this page are PEB Corp Group projects with a cold-formed steel structure. PEB Corp handled the engineering, and SmartBrix Construction handled the construction. For your own project, NewCon Steel® supplies cold-formed steel as material: LGS/CFS profiles, structural panels and structural kits.

How to read this page

NewCon Steel® is the steel manufacturing brand of the PEB Corp Group. The projects below belong to the group; we publish them as references for the cold-formed steel system, not as NewCon Steel orders. NewCon Steel was not the contractor of record. Areas and durations are those of the complete project. Where we do not hold a verified figure, we print "—".

Group references

Group projects with a cold-formed steel structure

PEB Corp Group

Ministry of Defense

39,000 m² delivered in 8 months. It is the group's scale reference. It shows the volume a cold-formed steel frame can absorb when the structure arrives prefabricated instead of being framed piece by piece on site.

39,000 m²8 months
See the project at PEB Corp →
PEB Corp Group

Universidad del Rosario

11,500 m² in 100 days. It is a speed reference at an institution that stayed in operation, where the academic calendar set the schedule.

11,500 m²100 days
See the project at PEB Corp →
PEB Corp Group

Gimnasio Fontana

A project delivered in 90 days, with a cold-formed steel structure.

90 days
PEB Corp Group

Pradera de Potosí

650 m² (about 7,000 sq ft). It is the smallest published area on this page: the cold-formed steel system works for a small project as well as a large one.

650 m²

SmartBrix Construction's documented portfolio, with area, schedule, and city →

Verified data

Published area and duration by project

A "—" means we do not hold a verified figure. We would rather print the dash than round a number up.

What we publish and what we do not
Project (PEB Corp Group)Published areaPublished duration
Ministry of Defense39,000 m²8 months
Universidad del Rosario11,500 m²100 days
Saint Peters Academy—3 months
Colegio Santa Luisa2,500 m²3 months
Gimnasio Fontana—90 days
Pradera de Potosí650 m²—
Centro de Control POB——
Ecopetrol——

Areas and durations correspond to the complete project as executed by the PEB Corp Group. A reference project’s area and delivery period describe that case; they do not guarantee another building’s schedule. NewCon Steel does not publish tonnage, linear meters or prices for these projects, because they are third-party contract data.

Group clients

Who the PEB Corp Group has worked with

This list belongs to the PEB Corp Group, not to NewCon Steel as a standalone entity. We publish it because it shows that the group has been through institutional, corporate and heavy-industry procurement, with the document review those processes require.

Ministry of DefenseEcopetrolCopa AirlinesChevronBavariaUniversidad del RosarioHOCOLISAGENWeatherfordGas Natural FenosaCanacol EnergyAESTrafiguraCity of BogotáUniversidad Latina
Manufacturing and erection

From plant to site: fabrication and erection

These images show the plant and the group's structural erection work. They illustrate the process and do not necessarily correspond to the projects listed above.

The group

What each group company does

NewCon Steel®

Manufactures and ships the steel

NewCon Steel manufactures LGS/CFS profiles, structural panels, structural kits and bolted structural steel at the group plant, in operation since 2018. What you buy is material: linear meters, m² of panel or metric tons (1,000 kg) of structure.

Manufacturing
See structural kits →
PEB Corp

Provides the group's engineering

PEB Corp is the parent company of the PEB Corp Group and provides the structural engineering, BIM design and institutional relationship behind the projects on this page.

Parent
Go to PEB Corp →
SmartBrix Construction

Executes the construction

SmartBrix Construction is the group's construction unit. If you need the building built turnkey as well as the steel, that conversation is with SmartBrix.

Construction
Go to SmartBrix Construction →

Get a steel quote for a similar project

Reply within 24 business hours · technical proposal / quote in 48 h. Send quantities (lm, m² or metric tons), profile thickness and destination country.

Message us on WhatsApp
Get a quote WhatsApp