Ministry of Defense
Over 39,000 m² delivered in 8 months. It is the group's scale reference: the volume a cold-formed steel framing system can absorb when the structure leaves the plant prefabricated instead of being framed piece by piece on site.

The steel we manufacture is already standing: the Ministry of Defense, 39,000+ m²; Universidad del Rosario, 11,500 m² in 100 days. These are PEB Corp Group projects, and NewCon Steel's part is the manufacture of the cold-formed steel structure — a line we draw for you before you have to ask.
The projects on this page are PEB Corp Group works in which the cold-formed steel structure was fabricated by the group's manufacturing operation, which today trades as NewCon Steel®; the engineering belongs to Pre-Engineered Buildings Corp and the construction to SmartBrix Construction.
NewCon Steel® is the steel manufacturing brand of the PEB Corp Group, and the works below are group projects — NewCon Steel is not the contractor of record. What is ours is the fabrication of the cold-formed steel structure. The areas and durations are those of the group's project; where we do not hold a verified figure, we print "—" and leave it at that.
Over 39,000 m² delivered in 8 months. It is the group's scale reference: the volume a cold-formed steel framing system can absorb when the structure leaves the plant prefabricated instead of being framed piece by piece on site.
11,500 m² in 100 days. A speed reference on an institution that stayed in operation, where the schedule was not a commercial preference but a constraint of the academic calendar.
Delivered in 3 months. An education building with a cold-formed steel structure fabricated by the group's manufacturing operation.
Delivered in 3 months. Another education building handed over inside a school-holiday window, which is the pattern this structural system makes repeatable.
Delivered in 90 days. Cold-formed steel structure fabricated by the group's manufacturing operation.
650 m². Small scale, same production line, same ±0.5 mm tolerance: there is no second-tier steel for small orders.
A "—" means we do not hold a verified figure. We would rather print the dash than a number rounded generously upward.
| Project (PEB Corp Group) | Published area | Published duration | Manufacturing scope |
|---|---|---|---|
| Ministry of Defense | 39,000+ m² | 8 months | Cold-formed steel structure |
| Universidad del Rosario | 11,500 m² | 100 days | Cold-formed steel structure |
| Saint Peters Academy | — | 3 months | Cold-formed steel structure |
| Colegio Santa Luisa | — | 3 months | Cold-formed steel structure |
| Gimnasio Fontana | — | 90 days | Cold-formed steel structure |
| Pradera de Potosí | 650 m² | — | Cold-formed steel structure |
| Centro de Control POB | — | — | Cold-formed steel structure |
| Ecopetrol | — | — | Cold-formed steel structure |
Areas and durations correspond to the project as executed by the PEB Corp Group, not to the manufacturing scope taken separately. We do not publish tonnage shipped, linear metres or prices for these projects: those are third-party contract data and they are not ours to disclose.
This list belongs to the group, not to NewCon Steel as a standalone entity. We publish it for what it actually means: the steel we manufacture has been through institutional, corporate and heavy-industry procurement — with all the documentary audit that implies.
Images of the plant and of the group's structural erection work. They do not necessarily correspond to the projects listed above: we publish them to show the process, not to attribute them to a specific job.






LGS/CFS profiles, structural panels, structural kits and bolted structural steel. What you buy is material: linear metres, m² of panel or tons of structure.
Parent company of the PEB Corp Group. Structural engineering, BIM design and the institutional relationship behind the projects listed on this page.
The group's construction arm. If, beyond the steel, you need somebody to build the building turnkey, that conversation is with them.
Send the area, the typology and the destination country. We will tell you which scope of supply fits — profiles, panels or a complete kit — and quote it formally in 48 hours.