PEB Corp Group · Cold-formed steel (LGS/CFS) manufacturer · PanamaPEB Corp Americas ↗·SmartBrix Construction ↗·info@newconsteel.com
LGS ProfilesPanelsKitsPlantEngineeringCoverageBolted steelProjectsDocumentationAboutFAQGet a quote in 48 h →
Español
A structural module being lifted on site
PEB Corp Group

Projects with a cold-formed steel structure

The steel we manufacture is already standing: the Ministry of Defense, 39,000+ m²; Universidad del Rosario, 11,500 m² in 100 days. These are PEB Corp Group projects, and NewCon Steel's part is the manufacture of the cold-formed steel structure — a line we draw for you before you have to ask.

The projects on this page are PEB Corp Group works in which the cold-formed steel structure was fabricated by the group's manufacturing operation, which today trades as NewCon Steel®; the engineering belongs to Pre-Engineered Buildings Corp and the construction to SmartBrix Construction.

How to read this page

NewCon Steel® is the steel manufacturing brand of the PEB Corp Group, and the works below are group projects — NewCon Steel is not the contractor of record. What is ours is the fabrication of the cold-formed steel structure. The areas and durations are those of the group's project; where we do not hold a verified figure, we print "—" and leave it at that.

Group references

Works whose cold-formed structure was fabricated by the group's manufacturing operation

PEB Corp Group

Ministry of Defense

Over 39,000 m² delivered in 8 months. It is the group's scale reference: the volume a cold-formed steel framing system can absorb when the structure leaves the plant prefabricated instead of being framed piece by piece on site.

39,000+ m²8 months
See the project at PEB Corp ↗
PEB Corp Group

Universidad del Rosario

11,500 m² in 100 days. A speed reference on an institution that stayed in operation, where the schedule was not a commercial preference but a constraint of the academic calendar.

11,500 m²100 days
See the project at PEB Corp ↗
PEB Corp Group

Saint Peters Academy

Delivered in 3 months. An education building with a cold-formed steel structure fabricated by the group's manufacturing operation.

3 months
See the project at PEB Corp ↗
PEB Corp Group

Colegio Santa Luisa

Delivered in 3 months. Another education building handed over inside a school-holiday window, which is the pattern this structural system makes repeatable.

3 months
See PEB Corp Group projects ↗
PEB Corp Group

Gimnasio Fontana

Delivered in 90 days. Cold-formed steel structure fabricated by the group's manufacturing operation.

90 days
See PEB Corp Group projects ↗
PEB Corp Group

Pradera de Potosí

650 m². Small scale, same production line, same ±0.5 mm tolerance: there is no second-tier steel for small orders.

650 m²
See PEB Corp Group projects ↗
Verified data

What we publish and what we do not

A "—" means we do not hold a verified figure. We would rather print the dash than a number rounded generously upward.

Project (PEB Corp Group)Published areaPublished durationManufacturing scope
Ministry of Defense39,000+ m²8 monthsCold-formed steel structure
Universidad del Rosario11,500 m²100 daysCold-formed steel structure
Saint Peters Academy3 monthsCold-formed steel structure
Colegio Santa Luisa3 monthsCold-formed steel structure
Gimnasio Fontana90 daysCold-formed steel structure
Pradera de Potosí650 m²Cold-formed steel structure
Centro de Control POBCold-formed steel structure
EcopetrolCold-formed steel structure

Areas and durations correspond to the project as executed by the PEB Corp Group, not to the manufacturing scope taken separately. We do not publish tonnage shipped, linear metres or prices for these projects: those are third-party contract data and they are not ours to disclose.

Group clients

Who the PEB Corp Group has worked with

This list belongs to the group, not to NewCon Steel as a standalone entity. We publish it for what it actually means: the steel we manufacture has been through institutional, corporate and heavy-industry procurement — with all the documentary audit that implies.

Ministry of DefenseEcopetrolCopa AirlinesChevronBavariaUniversidad del RosarioHOCOLISAGENWeatherfordGas Natural FenosaCanacol EnergyAESTrafiguraCity of BogotáUniversidad Latina
Manufacturing and erection

How the steel leaves the plant and how it goes up

Images of the plant and of the group's structural erection work. They do not necessarily correspond to the projects listed above: we publish them to show the process, not to attribute them to a specific job.

The group

Who did what

NewCon Steel®

Manufactures and ships the steel

LGS/CFS profiles, structural panels, structural kits and bolted structural steel. What you buy is material: linear metres, m² of panel or tons of structure.

Manufacturing
Structural kit supplied →
SmartBrix Construction

Executes the construction

The group's construction arm. If, beyond the steel, you need somebody to build the building turnkey, that conversation is with them.

Construction
Built by SmartBrix Construction ↗

Does your project look like one of these?

Send the area, the typology and the destination country. We will tell you which scope of supply fits — profiles, panels or a complete kit — and quote it formally in 48 hours.