Steel receiving and traceability checklist

A working checklist for comparing received steel with the order, takeoff and batch documentation. Record quantities, identification and discrepancies before completing receiving.

Technical library

Prepare the record

Identify the project, order number, date, delivery location and person recording receipt. Gather the order, packing list, takeoff or drawings and relevant material documents.

The CSV template contains checks and empty cells for result, observations and evidence. Use “Conforms”, “Discrepancy”, “Pending” or “Not applicable”, according to the available documentation. A pending check does not mean acceptance.

Technical library

Receiving and traceability checks

Checklist
CheckWhat to verifyReference
Order and destinationCompare supplier, order number, destination and shipping reference.Purchase order and shipping document
Drawing revisionRecord the takeoff or drawing revision used to identify the parts.Approved takeoff or shop drawing
Bundles and identificationCompare bundle and part labels with the packing list.Packing list and labels
QuantitiesRecord received quantities and shortages or surplus using the order units.Order and packing list
Section and thicknessCompare product identification with the ordered section and thickness. Record items awaiting verification.Order specification and project data sheet
Material batchRecord the batch identifier and the document linking it to the supply.Batch material certificate and order traceability
Visible conditionRecord dents, deformation and visible damage to coating, packaging or labels. Attach identified photographs.Photographic record and receiving document
Included accessoriesCheck connections, fasteners and accessories only against the list included in the offer.Bill of materials included in the order
Discrepancies and closureDescribe each discrepancy, the party reviewing it and the response received before closing the record.Discrepancy record and supplier response

Technical library

How to document a discrepancy

  • Identify the order, affected bundle or part and document revision used.
  • Record the quantity and description of the discrepancy, with photographs and date.
  • Request review by the party responsible for supply and keep the response with the record.
  • Keep pending items identified so they are not confused with material already reviewed.

Technical library

Use and scope

This checklist organizes documentary and visual receiving. It does not certify material, replace testing or independently define structural acceptance or erection safety procedures. Apply your contract specifications and responsibilities.

Traceability requires linking the part or bundle to the order and documented batch. If that link is unclear, record the item as pending and request the information before closing the record.

Manufacturing process and part identification

Technical library

Continue your request

Identify the order, product and document you need.

Message us on WhatsApp
Get a quote WhatsApp